My Layouts - BCSJ III - Construction - Mar 12, 2005 - 6
The west end of Oakhill. The gravel spur is raised up instead of going down from the siding. But then the floor of the gravel pit will be higher than the mainline and sidings.

Beyond the gravel spur the mainline spans the train entry on the swing bridge before heading toward Bear Creek (although only the temporary Salem staging is present at this time).

I use the cans as track weights when I glue the track down.
This page and image are copyright © 2005 by Charlie Comstock. All rights reserved