left-arrow up-arrow right-arrow BC&SJ Op Session - Jan 11, 2020 - 14
left-arrow right-arrow

Train crewman Mike (left) is being pressed into duty as a helper engineer while Rodger (right) looks on. Yardmaster Dan (center) supervises as the SP tiger-stripe SD-7 is inserted into the middle of train 200. The helper was added because the front end motive power would not be able to lift the extra long train up the 2.3% grade to Oakhill.