left-arrow up-arrow right-arrow Bear Creek and South Jackson Operations - WOOPS 2017 ops weekend - May 20, 2017 - 14
left-arrow right-arrow

Train 200 has made it all the way around the modeled portion of the layout to South Jackson where another block swap is needed. After this, it will head through the backdrop and off to main staging on the lower level of the peninsula. In the background, another train crew checks the Toh Junction (Toh stands for top-of-helix) panel in the sky at the end of the South Jackson aisle to see whether they have a green indication for coming into Browning on the far side of the aisle.