left-arrow up-arrow right-arrow Bear Creek and South Jackson Operations - WOOPS 2017 ops weekend - May 20, 2017 - 6
left-arrow right-arrow

Over on the other side of the backdrop, Mark the Bear Creek yardmaster is scrutinizing his train lineup and yardmaster hint sheet, planning for a meet between trains 200 and 201. On the left side of the aisle, the crew of train 201 waits for it to finish ascending the helix from main staging (the level below the yard) before calling Toh Junction tower to get lined through the interlocking into South Jackson. In the rear, Al is the Bear Creek station operator and Winston Junction towerman. Winston Junction is where the Siskiyou branch line connects with the main.