left-arrow up-arrow right-arrow Bear Creek and South Jackson Operations - WOOPS 2017 ops weekend - May 20, 2017 - 5
left-arrow right-arrow

Back in Redland on the Deschutes branch, the local switch crew continues their race to get the eastward outbound cars pulled before X60E (Deschutes Hauler East) shows up in town. Above them on the mainline, the Oakhill Turn, X79W, has made it up the 2.8% grade from Mill Bend and is switching the log loading spur.