We've stopped in South Jackson until the Toh Jct tower operator (tonight, that's the yardmaster) aligns our route. Engineer Tom is looking at the display panel above the end of the yard.
After departing Salem (in staging), ascending the helix, and running through Toh Jct. a long time ago, we passed into the modeled portion of the railroad at Browning (left) on the opposite side of the aisle from South Jackson.
This page and photos copyright © 2015 by Charlie Comstock.