Bear Creek and South Jackson Operations - BC&SJ III Op Sessions - September 25, 2010 - 5
Meanwhile Paul M. has finished with the Millbend load loading spur and is on the radio with the dispatcher to get a warrant to Oakhill. The dispatcher needs to be careful here. The Deschutes Express is going to be coming soon and it's a 1st class train - superior to the Oakhill Turn in priority, but the Oakhill Turn is more than slightly in the way of the express which needs to do run around itself in Millbend before heading down the branchline to Deschutes. Tonight, the Oakhill turn managed to get their work done on time so the DS sent them up to Oakhill before the scheudled departure time of the express. Good job guys!.
This page and photos copyright © 2010 by Charlie Comstock.