Bear Creek and South Jackson Operations - BC&SJ III Op Sessions - Jan 31, 2009 - 22
Norm A. doesn't appear to be letting the constipation in his yard bother him. Yet. But there will soon be another train heading for his yard from Pocatello (coming from the left) and that will lead to some real head scratching.

The solution will involve having the Deschutes Hauler East pull ahead onto the switch lead (which is about 10 miles long in South Jackson) clearing the siding track and allowing the other train to pull around the Bear Creek Hauler East which is on the mainline. Trouble is the other train is the local passenger train which has a station stop in South Jackson and should be on the main. The passengers will have to wait until BCHE pulls out of town before they can make the journey twixt the train and the station! Yikes!

This page and photos copyright © 2009 by Charlie Comstock.