Up in Oakhill the OHT's crew is working away. It's possible (usually) but not simple for
the Oakhill Turn to switch the log loading, team track, and gravel spurs, and turn their train
for the trip back to Mill Bend without using the mainline.
Today there's 1 hopper car too many to fit so they cajole the DS into letting them out on the main track for a run around. Click here for the 'official' guide to switching Oakhill. |