The other early train is engineered by Ken Lass. BCSW has arrived at South Jackson from Pocatello
staging and is preparing to swap blocks with
yard master Len. Today the train is near max capacity and is pulled by an A-B-A set of Stewart F7s.
The length of the train will become a problem when it arrives at Oakhill later on... Bad planning
on who ever the dumb-kopf was that did the staging and schedule setup...
|