left-arrow up-arrow right-arrow Test siting Abner - Mar 22, 2021 - 9
left-arrow right-arrow

A different view of where I had to dig out the hillside between Abner and Browning to make room for expansion of the Castor Oil Flakes factory. The buildings and the road will get 5mm plywood underlay raising them up to near the Toledo branch track level. Less of a gradient for the tracks crossing the road and not as big a lump in the road at the grade crossings, too. This will extend under the car repair facility and bulk oil dealer and will taper down as it passes the Daark Electric building. I expect that tapering may be a little tricky.