left-arrow up-arrow right-arrow Lower Bear Creek history - 2016 - 4
left-arrow right-arrow

Jan 4, 2016 - The view looking railroad west down the mainline bridge. I laid the original flextrack in place on the bridge and we could run trains on the mainline again. That track will soon be replaced with some Micro Engineering bridge track.