left-arrow up-arrow right-arrow Lower Bear Creek history - 2016 - 2
left-arrow right-arrow

Jan 4, 2016 - Next step was figuring out the abutments. I did this with two pieces of cardstock. In the process I realized the hillside behind the right end of the bridge was too close to the track, so I moved it back a bit.