left-arrow up-arrow right-arrow Lower Bear Creek history - 2016 -1
left-arrow right-arrow

Jan 4, 2016 - With the mainline bridge's abutments under control, it was time to work on the Siskiyou branch bridge. After assembling the Central Valley bridge kit, I used it as a template to determine where to cut the branchline's roadbed.