left-arrow up-arrow right-arrow Lower Bear Creek history - 2015 - 14
left-arrow right-arrow

Dec 10, 2015 - It was time to replace the plywood roadbed/bridge with a real (well, modeled) bridge. The tracks here have a curve at the near end so I needed to make a template. I have carbon paper on hand - an artifact of Time Table Train Order operations where some orders require multiple copies. I covered the tracks with it. Mr. Blue Thumbs!