BCSJ III - Peninsula Construction Begins - June 7, 2008 - 11

The helix table legs are set in position and part of the rim is clamped in place. We'll set the level of the table top before fastening the legs in place (since the floor isn't particularly flat).

This page and image are copyright © 2008 by Charlie Comstock. All rights reserved