BCSJ III - Op Session Aftermath - Oakhill - Oct 7, 2006 - 1

Looking from the swing bridge at the layout entry way toward Oakhill proper we see the Oakhill Turn crew preparing to wye their engine as one of the local giants watches. By using the gravel track (lower right) the crew can avoid going out on the mainline for this manuever.

This page and image are copyright © 2006 by Charlie Comstock. All rights reserved