This is what an engineer would see coming out of the west portal
of tunnel 2. The mesh is getting close to ready for to have cheesecloth
hot-glued down on it.
The track runs along the less steep bank of Roberts creek. The Left bank of the creek will be a vertical rock face. When the railroad surveyors arrived here they decided bridges were easier than blasting out all that rock! |