BCSJ Construction Feb 12, 2004 - 9
Enough benchwork was completed in Redland to lay some track. But I wasn't sure of exactly what industries, their sizes, and the track configuration to serve them. What to do? No problem, there was a box of old Atlas turnouts (used for temporary purposes on the previous layout) as well as a whole bunch of Atlas flex from the old staging areas. Let's nail some down to make another town to help get a little more operation going. I also put Jallen (my timesaver module) at the end of Redland as a little bonus. Some trees and a few buildings helps disguise the plywood flats look of the place. The benchwork above Redland supports the track from Mill Bend to Oak Hill.

This page and image are copyright © 2004-2005 by Charlie Comstock. All rights reserved