Enough benchwork was completed in Redland to lay some track.
But I wasn't sure of exactly what industries, their sizes, and
the track configuration to serve them. What to do? No problem,
there was a box of old Atlas turnouts (used for temporary purposes
on the previous layout) as well as a whole bunch of Atlas flex
from the old staging areas. Let's nail some down to make another
town to help get a little more operation going. I also put Jallen
(my timesaver module) at the end of Redland as a little bonus.
Some trees and a few buildings helps disguise the plywood flats
look of the place. The benchwork above Redland supports the
track from Mill Bend to Oak Hill.
|