BCSJ II - October 20, 2002
Note: As I write this the BC&SJ is gone (and has been since
December 2002). I'm awaiting a move into new quarters before the
BC&SJ will rise again.
When the BC&SJ was setup for operation I pulled out the Jallen and
Bear Creek Salvage (East Jallen) modules and connected them to the
main layout with a causeway. This became the Jallen branch and
was the destination of the Jallen Turn that switches the industries
along the way. For quite a while the Jallen causeway was a rudimentary
affair - bare plywood with braces topped with flex track.
For the 2003 MR photo contest I decided to build a new causeway
incorporating detailed scenery. Here are some photos of the
new scenery.
Click 'em too enlarge 'em.