- BCSJ Construction 04/09/01 - 23
This train has just left Bear Creek heading east and is now in (hanging out of?) the temporary Pocatello staging area (the eastern end of the BC&SJ). The temporary Pocatello staging area will soon be replaced with mainline track heading uphill towards Mill City. A new Pocatello staging area will be added along the wall on the right about 18" above the yellow 50' box car. Mill City will be along the back (white) wall about 10' to the left of this picture. The other track visible inside the mainline curve is the Bear Creek Yard lead track. The caboose at the end of the train is almost directly above Albany Crossing.