- BCSJ Construction 04/09/01 - 18
This view shows the "albany" end of lower level staging (on the left). The track on the right leads downhill from Bear Creek to Albany Junction where the staging leads split - arriving trains take the left leg, trains departing staging will appear on the right leg. There was insufficient space to have two 180 degree turnback curves adjancent to one another so they were overlapped - necessitating the double curved diamond at Albany Crossing! But allowing a much more convienient staging operation (staging contained on a reverse loop allow uni-direction train operation).