- BCSJ Construction 04/09/01 - 16
The Bear Creek grain elevator will be on the left (still in box). The mainline to Salem staging heads downhill (to the lower left) after passing the tower at Bear Creek Junction (the Bear Creek cutoff / reverse loop). The horizontal piece of wood clamped to the top of a peninsula stud indicates the aproximate height of the next deck.