- BCSJ Construction 04/09/01 - 4
You're looking through the gap in the backdrop (or where the backdrop will be installed) where the Bear Creek cutoff (reverse loop) track passes. A switcher pushes cars past the Milling Co. and Diamond fruit packers (barely visible on the left). I really like the way the trackwork sort of "swoops" around here.